  1. DRAG DROP

    You are the production supervisor at a manufacturing company. You are in the process of configuring the production control module and its parameters.

    A company plans to use manufacturing execution. Bill of materials (BOM) item consumption must be generated when items are reported at the operation level.

    You need to configure the Manufacturing execution production order defaults form to allow for back flushing on operations.

    How should you set up Automatic BOM consumption? To answer, drag the appropriate setting to the correct targets. Each source may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.

    NOTE: Each correct selection is worth one point.

    MB-320 Microsoft Dynamics 365 Supply Chain Management, Manufacturing Part 01 Q01 001 Question
    MB-320 Microsoft Dynamics 365 Supply Chain Management, Manufacturing Part 01 Q01 001 Question

    MB-320 Microsoft Dynamics 365 Supply Chain Management, Manufacturing Part 01 Q01 001 Answer
    MB-320 Microsoft Dynamics 365 Supply Chain Management, Manufacturing Part 01 Q01 001 Answer
  2. DRAG DROP

    A skateboard manufacturer uses route operations to schedule resources and estimate units per hour. All products use the same sub assembly item and resource sanding process.

    You observe an increase in the number of units a sanding belt resource can produce. The production schedule is now inaccurate due to the number of units the sanding belt line can produce.

    You must make a permanent change to the number of units the resource can produce for all future orders.

    You need to adjust the process quantity on the route operation.

    Which three actions should you perform in sequence? To answer, move the appropriate actions form the list of actions to the answer area and arrange them in the correct order.

    MB-320 Microsoft Dynamics 365 Supply Chain Management, Manufacturing Part 01 Q02 002 Question
    MB-320 Microsoft Dynamics 365 Supply Chain Management, Manufacturing Part 01 Q02 002 Question

    MB-320 Microsoft Dynamics 365 Supply Chain Management, Manufacturing Part 01 Q02 002 Answer
    MB-320 Microsoft Dynamics 365 Supply Chain Management, Manufacturing Part 01 Q02 002 Answer
  3. HOTSPOT

    A company implements Dynamics 365 Supply Chain Management. You must use functionality in the system for group production runs to prevent downtime and excessive cleaning of the machines on the production line.

    You need to set up the system.

    Which behaviors should you expect? To answer, select the appropriate options in the answer area.

    NOTE: Each correct selection is worth one point.

    MB-320 Microsoft Dynamics 365 Supply Chain Management, Manufacturing Part 01 Q03 003 Question
    MB-320 Microsoft Dynamics 365 Supply Chain Management, Manufacturing Part 01 Q03 003 Question

    MB-320 Microsoft Dynamics 365 Supply Chain Management, Manufacturing Part 01 Q03 003 Answer
    MB-320 Microsoft Dynamics 365 Supply Chain Management, Manufacturing Part 01 Q03 003 Answer
  4. DRAG DROP

    A pharmaceutical manufacturer uses Process manufacturing.

    You are consolidating planned batch orders for a specific medication. The order must cover two weeks of demand. No other items need to be consolidated.

    You need to change the coverage group of the items.

    Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

    MB-320 Microsoft Dynamics 365 Supply Chain Management, Manufacturing Part 01 Q04 004 Question
    MB-320 Microsoft Dynamics 365 Supply Chain Management, Manufacturing Part 01 Q04 004 Question

    MB-320 Microsoft Dynamics 365 Supply Chain Management, Manufacturing Part 01 Q04 004 Answer
    MB-320 Microsoft Dynamics 365 Supply Chain Management, Manufacturing Part 01 Q04 004 Answer
  5. You are the production supervisor at a chemical processing plant. You must track attributes for each batch of chemicals. Automated quality orders must be generated when a batch order for these chemicals is reported as finished.

    You need to ensure that the values of attributes are updated and tracked.

    What three actions should you perform? Each correct answer presents part of the solution.

    NOTE: Each correct selection is worth one point.

    • Assign the attributes to the chemicals 
    • Assign the attributes to the appropriate test on the test group
    • Create attribute types
    • Set up batch attributes
    • Create a test instrument for each attribute
  6. HOTSPOT

    You are developing a new car audio system kit. The kit configuration has restrictions based on car model, speaker size, and other expression constraints.

    You need to set up a new item for the car audio system.

    How should you create the new product? To answer, select the appropriate option in the answer area.

    NOTE: Each correct selection is worth one point.

    MB-320 Microsoft Dynamics 365 Supply Chain Management, Manufacturing Part 01 Q06 005 Question
    MB-320 Microsoft Dynamics 365 Supply Chain Management, Manufacturing Part 01 Q06 005 Question

    MB-320 Microsoft Dynamics 365 Supply Chain Management, Manufacturing Part 01 Q06 005 Answer
    MB-320 Microsoft Dynamics 365 Supply Chain Management, Manufacturing Part 01 Q06 005 Answer
  7. A manufacturer produces HDMI cables. Typically, the item is manufactured.

    The manufacturer will occasionally buy unbranded HDMI cables from a vendor in order to keep up with demand. The company must use the same item number whether they make or buy the item.

    What should you do?

    • Select route type as vendor on the route operation when the item is to be purchased. 
    • In default order settings, select Production for the default order type
    • Create a new vendor resource when the item is to be purchased
    • In default order settings, select Purchase for the default order type
  8. DRAG DROP

    A company manufactures high-end speakers. Customers may choose different color finishes and front grills. You build a product configuration model to represent this speaker.

    You add the following attributes for the finish and grill.

    MB-320 Microsoft Dynamics 365 Supply Chain Management, Manufacturing Part 01 Q08 006
    MB-320 Microsoft Dynamics 365 Supply Chain Management, Manufacturing Part 01 Q08 006

    You need to create a constraint that defines the allowable finish and grill combinations.

    Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions and arrange them in the correct order.

    MB-320 Microsoft Dynamics 365 Supply Chain Management, Manufacturing Part 01 Q08 007 Question
    MB-320 Microsoft Dynamics 365 Supply Chain Management, Manufacturing Part 01 Q08 007 Question

    MB-320 Microsoft Dynamics 365 Supply Chain Management, Manufacturing Part 01 Q08 007 Answer
    MB-320 Microsoft Dynamics 365 Supply Chain Management, Manufacturing Part 01 Q08 007 Answer
  9. DRAG DROP

    A configure-to-order company is implementing Dynamics 365 Supply Chain Management. The company is preparing to use the product configuration model functionality to develop the Bill of materials (BOM), routes and valid configuration combinations.

    You need to set up the configuration models, constraints, and pricing.

    In which order should you perform the actions? To answer, move all actions from the list of actions to the answer area and arrange them in the correct order.

    MB-320 Microsoft Dynamics 365 Supply Chain Management, Manufacturing Part 01 Q09 008 Question
    MB-320 Microsoft Dynamics 365 Supply Chain Management, Manufacturing Part 01 Q09 008 Question

    MB-320 Microsoft Dynamics 365 Supply Chain Management, Manufacturing Part 01 Q09 008 Answer
    MB-320 Microsoft Dynamics 365 Supply Chain Management, Manufacturing Part 01 Q09 008 Answer
  10. HOTSPOT

    A company manufactures high-end speaker systems. You have different configurations available for customers to customize features including finishes and speaker materials. You have a product configuration model with bill of material lines and conditions for each component.

    A customer can optionally add on protective covers, but only if a non-metal material is selected. If any other material is selected, the covers cannot be added. You add the following attributes:

    MB-320 Microsoft Dynamics 365 Supply Chain Management, Manufacturing Part 01 Q10 009
    MB-320 Microsoft Dynamics 365 Supply Chain Management, Manufacturing Part 01 Q10 009

    You need to create an expression-based constraint that will only allow Corner Protection if Metal is not selected.

    How should you complete the expression? To answer, select the appropriate options in the answer area.

    NOTE: Each correct selection is worth one point.

    MB-320 Microsoft Dynamics 365 Supply Chain Management, Manufacturing Part 01 Q10 010 Question
    MB-320 Microsoft Dynamics 365 Supply Chain Management, Manufacturing Part 01 Q10 010 Question

    MB-320 Microsoft Dynamics 365 Supply Chain Management, Manufacturing Part 01 Q10 010 Answer
    MB-320 Microsoft Dynamics 365 Supply Chain Management, Manufacturing Part 01 Q10 010 Answer
  11. DRAG DROP

    A manufacturer uses route operations and job scheduling.

    You use a unique calendar for a conveyor line. The company observes a decrease in the number of hours a conveyor line resource is operational due to breakdowns. You must make a temporary change to the number of hours the resource is available.

    You need to adjust the efficiency percentage for the conveyor line calendar.

    Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

    MB-320 Microsoft Dynamics 365 Supply Chain Management, Manufacturing Part 01 Q11 011 Question
    MB-320 Microsoft Dynamics 365 Supply Chain Management, Manufacturing Part 01 Q11 011 Question

    MB-320 Microsoft Dynamics 365 Supply Chain Management, Manufacturing Part 01 Q11 011 Answer
    MB-320 Microsoft Dynamics 365 Supply Chain Management, Manufacturing Part 01 Q11 011 Answer
  12. A company produces paints and assembles bicycle frames.

    You must account for paint drying time before assembly operations can begin. You need to set up the operation to encompass queue times.

    Which two options can you use? Each correct answer presents part of solution.

    NOTE: Each correct selection is worth one point.

    • Enter a value in the queue time after field for the painting operation 
    • Make a resource group for each size and color and assign that group to the operation
    • Enter a value in the transit time on the painting operation
    • Enter a value in the queue time before field for the assembly operation 
    • Build capabilities for each resource related to color
  13. DRAG DROP

    A company manufactures automobile engines.

    You must create product configurations for values that are used in different types of engines. Each value is based on a master valve design. Different gaskets and fittings are used to allow valves to work with different engines.

    You need to translate production plans into Dynamics 365 Finance and Operations elements.

    Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

    MB-320 Microsoft Dynamics 365 Supply Chain Management, Manufacturing Part 01 Q13 012 Question
    MB-320 Microsoft Dynamics 365 Supply Chain Management, Manufacturing Part 01 Q13 012 Question

    MB-320 Microsoft Dynamics 365 Supply Chain Management, Manufacturing Part 01 Q13 012 Answer
    MB-320 Microsoft Dynamics 365 Supply Chain Management, Manufacturing Part 01 Q13 012 Answer
  14. You maintain responsible resource calendars and production orders for a manufacturing company. All production resources use the same production calendar.

    A machine in the facility is defective and must be closed for repairs for the next two days.

    You need to configure the resource calendar to close the resource for production for the next two days.

    What should you do?

    • Navigate to the resource group. Change the calendar to closed on the resource group.
    • Navigate to the calendar used for production and close the next two days.
    • Navigate to the resource. Change the calendar to closed on the resource.
    • Navigate to the resource and select Calendar deviations. Set the calendar to closed for the next two days.
  15. A manufacturing company is implementing Dynamics 365 Supply Chain Management. The company uses a standard costing model to value inventory.

    During the setup of the system, all areas that impact the standard cost of the item must be configured correctly to calculate a complete standard cost by using routing, Bill of materials (BOM) and overhead burden.

    You need to verify that all areas of the system are correctly configured.

    Which object does NOT impact the standard cost of manufactured items?

    • item group
    • cost groups
    • cost categories
    • BOM formula
  16. DRAG DROP

    A glass bottle manufacturer uses route operations to schedule resources and track manufacturing costs.

    The company has recently seen an increase in demand and purchases another resource. The company uses the same costs per resource. However, the new resource costs more to run. The company must be able to track cost contributions for the new resource.

    You need to create a cost category for the new resource.

    Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

    NOTE: Each correct selection is worth one point.

    MB-320 Microsoft Dynamics 365 Supply Chain Management, Manufacturing Part 01 Q16 013 Question
    MB-320 Microsoft Dynamics 365 Supply Chain Management, Manufacturing Part 01 Q16 013 Question

    MB-320 Microsoft Dynamics 365 Supply Chain Management, Manufacturing Part 01 Q16 013 Answer
    MB-320 Microsoft Dynamics 365 Supply Chain Management, Manufacturing Part 01 Q16 013 Answer
  17. DRAG DROP

    You are the product design manager for a computer manufacturer.

    Your new laptop model is configurable. There are restrictions on which hardware components can be selected depending on the model. You create configuration groups for hardware and software.

    You need to create a new laptop item number and configurations.

    In which order should you perform the actions? To answer, move all actions from the list of actions to the answer area and arrange them in the correct order.

    MB-320 Microsoft Dynamics 365 Supply Chain Management, Manufacturing Part 01 Q17 014 Question
    MB-320 Microsoft Dynamics 365 Supply Chain Management, Manufacturing Part 01 Q17 014 Question

    MB-320 Microsoft Dynamics 365 Supply Chain Management, Manufacturing Part 01 Q17 014 Answer
    MB-320 Microsoft Dynamics 365 Supply Chain Management, Manufacturing Part 01 Q17 014 Answer
  18. A company is looking to use Dynamics 365 Supply Chain Management.

    The company is in the process of redesigning and retooling an existing manufacturing plant to group similar, cellular operations to improve efficiency and minimize wasted time between operations. They want to locate raw materials close to where they are needed without losing reorder visibility.

    You need to set up their environment.

    Which kind of production type should you implement?

    • Lean manufacturing
    • Process manufacturing
    • Discrete manufacturing
    • Manufacturing execution
  19. A company is looking to use Dynamics 365 Supply Chain Management.

    The company is in the process of redesigning and retooling an existing manufacturing plant to support a large long-running contract. They want to be able to forecast capacity to easily ramp up for additional products.

    You need to set up the environment.

    Which type of manufacturing should you implement?

    • Lean
    • Discrete
    • Job shop
    • Process
  20. DRAG DROP

    A company plans to implement Dynamics 365 Supply Chain Management.

    You need to determine which manufacturing solutions to use.

    Which manufacturing solution should you use? To answer, drag the appropriate setting to the correct drop targets. Each source may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.

    NOTE: Each correct selection is worth one point.

    MB-320 Microsoft Dynamics 365 Supply Chain Management, Manufacturing Part 01 Q20 015 Question
    MB-320 Microsoft Dynamics 365 Supply Chain Management, Manufacturing Part 01 Q20 015 Question

    MB-320 Microsoft Dynamics 365 Supply Chain Management, Manufacturing Part 01 Q20 015 Answer
    MB-320 Microsoft Dynamics 365 Supply Chain Management, Manufacturing Part 01 Q20 015 Answer
Subscribe
Notify of
guest
0 Comments
Newest
Oldest Most Voted
Inline Feedbacks
View all comments