MB-320 : Microsoft Dynamics 365 Supply Chain Management, Manufacturing : Part 05
-
You are responsible for product and formula maintenance for a paint manufacturer.
You create a formula for white paint and add its lines. When the formula size increases or an ingredient changes, the quantity of the pigment ingredient must be adjusted proportionately.
You need to set up the formula line for the pigment.
Which formula feature should you use?
- Pegged supply
- Step consumption
- Scalable
- Variable
-
You are a process engineer evaluating Lean vs. Discrete processing. You want to convert a Kanban item.
The item has the following Lean setup:
– The setup uses a Lean schedule group with a throughput ratio=2
– The process activity tied to production flow has the following runtime activity times: time=3 min, per quantity=1
– The work cell capacity has a model type of Throughput and an average throughput quantity of 60 per a capacity period of standard workday (8-hour day)
– The throughput is 10 per hourYou need to set up a Discrete operation to mirror the item’s production flow activity.
What should you do?
- Create a route with a runtime =1, a process quantity =6, and the operation’s hours/time =1
- Create a route with a runtime =1, a process quantity =10, and the operation’s hours/time =1
- Create a route with a runtime =6, a process quantity =1, and the operation’s hours/time =1
- Create a route with a runtime =10, a process quantity =6, and the operation’s hours/time =1
-
HOTSPOT
You are the production scheduler for a manufacturing company. You have run the Resource Group Capacity report as shown in the Resource Group 21 Capacity exhibit. (Click the Resource Group 21 Capacity tab).
After reviewing that report, you run Resource Capacity reports as shown in the Resource 2101 and 2102 Capacity exhibits. (Click the 2101 Capacity and 2102 Capacity tabs.)
You run the Gantt chart report as shown in the Gantt exhibit to determine the production orders scheduled on the resources. (Click the Gantt tab.)
You need to determine the method to schedule the production lines.
For each of the following statements, select Yes if the statement is true. Otherwise, select No.
NOTE: Each correct selection is worth one point.
-
HOTSPOT
You are the production scheduler at a manufacturing company. You schedule estimated production orders and ensure that capacity is used efficiently.
You have an order that must be scheduled at the resource group level and scheduled backward from the delivery date specified on the production order.
You need to schedule the order.
Which scheduling parameters should you use? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.
-
You work for a gem wholesaler that sells raw diamonds. Diamonds are purchased and sold in individual boxes but weighed and inventoried in carats.
You are setting up a catch weight item for diamonds. Each box of diamonds must be tracked by its individual container weight.
You need to set up this item as a full visibility catch weight item.
Which two steps must you perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.
- Assign it a Serial number group with per qty. defined as 1.
- Assign the item a Tracking dimension group with active serial number control.
- Create an inter-class unit of measure conversion between boxes and carats.
- Assign a Tracking dimension group with batch number as the only active tracking dimension.
-
DRAG DROP
You manage pricing for a food processing company. The raw meat used by the business is a commodity-traded product and has a changing purchase price.
You must implement the commodity pricing module. You create a pricing template with margin data.
You need to calculate the cost price for the manufactured goods as well as the sales price based on margin standards.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
-
You are building the Bill of materials (BOM) for a new production item. The new item has a subcomponent.
Sub production orders for the subcomponent must be created when estimating production orders.
You need to configure the BOM line to generate sub production orders.
Which BOM line type should you use?
- Phantom
- Vendor
- Item
- Pegged supply
-
Note: This question is part of series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A company produces and distributes seafood to supermarkets. During the manufacturing process, raw seafood is purchased, cleaned, and packaged into various-sized boxes. Each box may have a different weight.
Product is sold by the box and priced by the pound.
You need to ensure that you can perform transactions at the box level and record the net weight of goods shipped to a customer.
Solution: Set up the product as a catch weight item with serial control. Set the catch weight unit to box and the inventory unit to pounds.
Does the solution meet the goal?
- Yes
- No
-
Note: This question is part of series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A company produces and distributes seafood to supermarkets. During the manufacturing process, raw seafood is purchased, cleaned, and packaged into various-sized boxes. Each box may have a different weight.
Product is sold by the box and priced by the pound.
You need to ensure that you can perform transactions at the box level and record the net weight of goods shipped to a customer.
Solution: Set up the product as a catch weight item with batch control. Set the catch weight unit to box and the inventory unit to pounds.
Does the solution meet the goal?
- Yes
- No
-
Note: This question is part of series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A company produces and distributes seafood to supermarkets. During the manufacturing process, raw seafood is purchased, cleaned, and packaged into various-sized boxes. Each box may have a different weight.
Product is sold by the box and priced by the pound.
You need to ensure that you can perform transactions at the box level and record the net weight of goods shipped to a customer.
Solution: Set up the product with a sales unit measure of pounds and inventory unit measure of box. Set a standard unit conversation for the product from box to pounds.
Does the solution meet the goal?
- Yes
- No
- This is a case study. Case studies are not timed separately. You can use as much exam time as you would like to complete each case. However, there may be additional case studies and sections on this exam. You must manage your time to ensure that you are able to complete all questions included on this exam in the time provided.
To answer the questions included in a case study, you will need to reference information that is provided in the case study. Case studies might contain exhibits and other resources that provide more information about the scenario that is described in the case study. Each question is independent of the other question on this case study.
At the end of this case study, a review screen will appear. This screen allows you to review your answers and to make changes before you move to the next section of the exam. After you begin a new section, you cannot return to this section.
To start the case study
To display the first question on this case study, click the Next button. Use the buttons in the left pane to explore the content of the case study before you answer the questions. Clicking these buttons displays information such as business requirements, existing environment, and problem statements. If the case study has an All Information tab, note that the information displayed is identical to the information displayed on the subsequent tabs. When you are ready to answer a question, click the Question button to return to the question.Background
General information
A manufacturing company produces custom configured-to-order motorcycles. The company plans to implement Dynamics 365 Supply Chain Management. The company contains one legal entity located in Missouri where all production and warehousing operations occur.
Customization options
The custom motorcycles have a variety of selections that can be selected in the listed order by the end customer, including the following:
Current environment
Customization restrictions
The following restrictions on customizations are in place:
– Green color can only be sold with the Legend Trim.
– Orange color can be sold with the Sport or Legend Trim.
– The ML seat must be included in the Legend package.
– The MS seat must be included in the Sport package.Manufacturing facilities
The company includes the following manufacturing groups: Assembly and Plastic Molding. The Assembly group is responsible for assembling the motorcycles with purchased and manufactured goods. The Plastic Molding group is responsible for manufacture of all plastic parts used in the assembly area.
Motorcycle manufacturing
The parts for the product assembly are picked from the warehouse and staged at the correct workstation by a warehouse operator for each production order.
Plastic manufacturing
Plastic parts are molded using dyes that create multiple parts at once. The parts are machined in the same production process to remove excess plastic and add additional holes for assembly. Excess plastic is recycled back into the feedstock of the same color plastic chips for use in the molding process.
Metal parts
Raw metal parts are purchased fully machined but without primer or paint. The parts are subcontracted to a vendor for primer and paint based upon the color requirements.
Facility
The company has a single warehouse that supports both the assembly and plastic manufacturing areas. The warehouse consists of three aisles with 15 bins and three shelves. The facility has no Wi-Fi capacity but has hardwired terminal stations throughout the assembly production line.
Transactions are currently completed by office staff. Raw materials transfer must support capacity constraints for paint and primer.
Requirements
Sales orders
The company has the following requirements for sales orders:
– During the configuration of a sales order, invalid combinations must be prevented.
– Each configuration must create a unique bill of material (BOM) and Route based on options selected.
– Sales pricing for the sales order must be based upon options selected.
– Due to emissions regulations, the motorcycles cannot be sold to the state of California.Motorcycle manufacturing
The company has the following requirements for motorcycle manufacturing:
– Schedule labor only at the labor pool level without machines by day.
– Produce motorcycles within a scheduled day in any order.
– Record actual production labor with start/stop times.
– Record manager approval of labor entered prior to posting.
– Post actual material consumption after production is finished.Plastic manufacturing
The company has the following requirements for motorcycle manufacturing:
– Schedule both labor and machines.
– Adjust schedules by using a Gantt chart.
– Backflush standard labor by operation.
– Post actual material consumption at the start of production.
– Track and allocate costs to the excess plastic.
– Report multiple molded part numbers during the same production run.
– Determine the correct mold to use on a production order.
– Generate a batch number for each production order.Metal parts
The company has the following requirements for metal parts manufacturing:
– Schedule shipments to the vendor for painting.
– Receive painted parts into inventory from the vendor.
– Track vendor inventory levels.Defaults
You must configure defaults for manufacturing execution production orders to meet the following requirements:
– Ensure accuracy for production order pick list posting.
– Ensure correct pick list creation.Issues
– In the current system, the company cannot calculate overhead rates and determine the breakdown of material, labor, machine, and overhead costs for production.
– The company is manually calculating an 8% overhead on materials and posting a journal manually.-
HOTSPOT
You need to configure scheduling for each production area.
Which scheduling options should you use? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.
-
-
You produce 100 total units of finished goods. The amount of material used to produce the goods is the equivalent amount of material needed to produce 105 finished goods.
The company must track variances in material compared to the original estimated amount. You must only use one picking list journal for each production order.
You need to post a picking list that accounts for the material required to produce 105 finished goods.
What should you do?
- Post a picking list for 100 to account for the originally estimated amount. Post an additional picking list to account for the equivalent amount of material to produce 5 finished goods.
- Report as finished five additional units into the good quantity and post a picking list for only the originally estimated amount.
- In the Bill of materials production details, edit the estimated amount for each line to equal 105 units of raw material.
- When creating the lines for a picking list, select the estimated consumption option and override the consumption field with the actual amount to be consumed.
-
A customer produces light projection toys for holiday decorations throughout the year.
You are in the first month of a season. Production flows take one day to complete.
The floor supervisor reports that seasonal production targets will not be met. You review the Kanban schedule board and identify thousands of unplanned jobs.
You need to plan the jobs to be completed two weeks prior to the start of the next season.
What are two possible ways to achieve this goal? Each correct answer presents a complete solution.
NOTE: Each correct selection is worth one point.
- Set the Automatic planning option for each unscheduled job to Yes
- Manually schedule each unscheduled job on its due date
- Set the Automatic planning option for each unscheduled job to No
- Manually schedule each unscheduled job forward from the date of the end of the season
- Manually schedule each unscheduled job to the next period of the start of the next season
-
A customer produces light projection toys for holiday decorations throughout the year. Vendors have negotiated rebate agreements as a condition of their contract. The contract also contains the visual templates required for the customer to use in a season.
Vendor rebate agreements must only be applied if the following requirements are met:
– Units of measure for deliverables are the same unit of measure as on the agreement.
– The agreement is valid as of the date a purchase order is generated.You need to configure the vendor rebate agreements.
What should you do?
- Set the Calculation date type field value to Created
- Set the Cumulative purchase by field value to the end of the season date
- Set the Rebate line break type field value to Quantity
- Set the Cumulative purchase by field value to the beginning of the season date
-
A company uses Dynamics 365 Supply Chain Management for Process manufacturing.
You are reviewing the planned production orders for the next two weeks. There are several production orders for the same product. One order is scheduled to run the week after another order.
You need to optimize the planned production orders.
What should you do?
- Rerun master planning. Select the static plan with a coverage time fence of two weeks.
- Firm the orders
- In Planned orders, combine the production orders
- Rerun master planning. Select the dynamic plan with a coverage time fence of two weeks
-
HOTSPOT
A company implements Dynamics 365 Supply Chain Management.
You run a master plan each week.
You need to resolve the issue in the scenario.
What should you do? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.
-
DRAG DROP
You are the quality assurance manager of a pharmaceuticals company.
One of your customers has requested to only receive batches of item B0001 that have an acid concentration between 5.5% – 10.5%.
You need to set up the customer specific batch attribute to track percent acid for B0001.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in correct order.
-
You are a production manager at a company which produces large batches of coffee and creamers.
After a quality inspection, batch 120008 of your cold brew coffee (item number CB-0001) was found to be too acidic and must be reworked.
You need to add 20 grams of sugar and stir the product for an additional 0.5 hours.
What three actions are required on the rework order? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.
- Delete all items from the production formula except for 20 grams of sugar
- Add 20 grams of sugar to the production formula
- Delete all route operations except for a half an hour stirring operation
- Manually reserve batch 120008 after estimating the batch order
- Add a route operation for 0.5 run time hours of stirring
-
You have updated a cost category price from $5.00 to $7.00. You process a production order which uses the cost category.
After ending the order, you realize a new standard cost was not calculated after the price update.
You need to validate how this impacted the financial voucher transactions.
Which transaction would you see in the general ledger?
- $2.00 debit to the production price variance account
- $2.00 credit to the production price variance account
- $2.00 debit to the production quantity variance account
- $2.00 credit to the lot size variance account
-
DRAG DROP
You are the product manager at a distribution company. You are responsible for managing product compliance standards and reporting.
Chemical product, C0001 can be sold in all parts of the United States except for the state of California.
You need to set up these compliance requirements for C0001.
Which four actions should be performed in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.