Refer to the exhibit. A network administrator is configuring MST tuning on SW1. The objective is to change the path cost value of the interface Gi1/0/1 to represent a higher-speed bandwidth link. Which value could be used in the command spanning-tree mst 0 cost for this task?
- 0
- 1
- 24576
- 32768
Answers Explanation & Hints:
As shown in the output, the interface STP cost is derived from the media speed of the interface using the long-mode method. Using this method, the range of the interface path cost is from 1 to 200000000. A lower path cost represents higher-speed transmission bandwidth. |